Inspection
1. |
Connect the GDS on the Data Link Connector (DLC).
|
2. |
Turn the ignition switch ON.
|
3. |
Measure the output voltage of the APS 1 and 2 at C.T and W.O.T.
|
Purge Control Solenoid Valve (PCSV). Specifications
Specification
Item
Specification
Coil Resistance (Ω)
22.0 ~ 26.0 [20°C(68°F)]
...
Back-up Lamp Switch. Specifications
Specifications
1.
Working voltage: DC 10~15V
2.
Operating force: 3.0kg Max.
3.
Voltage drop: - 0.4V
...
Smart key. Repair procedures
Smart Key
Smart Key Code Saving
1.
Connect the DLC cable of GDS to the data link connector in driver
side crash pad lower panel, turn the power on GDS.
...