Inspection
1. |
Turn the ignition switch OFF.
|
2. |
Disconnect the PCSV connector.
|
3. |
Measure resistance between the PCSV terminals 1 and 2.
|
4. |
Check that the resistance is within the specification.
|
Removal
1. |
Turn the ignition switch OFF and disconnect the battery negative
(-) cable.
|
2. |
Disconnect the purge control solenoid valve connector (A).
|
3. |
Disconnect the vapor hoses (B) from the purge control solenoid
valve.
|
4. |
Remove the valve after removing the bolt (C).
|
Installation
|
|
1. |
Installation is reverse of removal.
|
2. Evaporative emission control (including ORVR: Onboard Refueling Vapor Recovery)
system
The Evaporative Emission Control System is designed to prevent fuel vapors from
escaping into the atmosphere. (The ORVR system is designed to allow the vapors from
the fuel tank to be loaded into ...
Power Window Switch. Schematic Diagrams
Circuit Diagram
Driver Power Window Switch
Passenger power window switch
Rear power window switch
...
To temporarily accelerate with the cruise control on
If you want to speed up temporarily when the cruise control is on, depress the
accelerator pedal. Increased speed will not interfere with cruise control operation
or change the set speed.
To retu ...